FIT-OUT OF HERITAGE BUILDING

PROJECT: FIT-OUT OF HERITAGE BUILDINGnCLIENT: SHELL NIGERIA EXPLORATION AND PRODUCTION COMPANY LIMITED (SNEPCo.)nLOCATION: IKOYI, LAGOSnTYPE: OFFICE BUILDING UPGRADEnSCOPE: FITOUT A HIGHRISE OFFICE BUILDING TO GRADE A STANDARDnnPROJECT OVERVIEW:nIn 2024, Horatio Limited delivered the Canteen Extension and Facilities Upgrade at Alpha 1 Podium as part of SNEPCo.’s commitment to staff welfare, operational efficiency and safe working environments in compliance with SNEPCo. HSSE, food safety and facilities management standards.nnTHE CHALLENGE:nSNEPCO. required a the fit-out of Heritage Building designed to seamlessly integrate with the existing building architecture and services while maintaining uninterrupted operations within the wider facility. nnTHE HORATIO SOLUTIONnHoratio deployed a multidisciplinary team of engineers, builders and fit-out specialists to execute the expansion, reconfiguration and modernization of the existing canteen within the podium level of the Alpha 1 commercial building.nnKey Deliverables:nnStripping & demolition nConstruction of Drywall Partition nProcurement & Installation Glass Partition nCorrective works / replacement of existing raised floor nProvision of floor Finishes nWall Finishing, Painting & Decoration nBranding, Signage and Glass Manifestation nCorrective works and making good of existing Ceiling nInterior Horticulture and biophilia nSnagging, testing, commissioning, and hand over to SHELLnnThe project was executed within a live office environment, with emphasis on risk mitigation, hygiene control and business continuity.nnTHE IMPACTnThe Heritage Building fit-out project enables SNEPCo. to modernize operations while preserving cultural value, enhancing ESG credentials, ensuring HSE compliance, and strengthening stakeholder trust without compromising the integrity of the historic asset.tntn
  • slide
  • slide
  • slide
  • slide
  • slide