PROJECT: ACCESS CONTROL BUILDING AND GATE HOUSE AT ALPHA 1 PODIUMnCLIENT: SHELL NIGERIA EXPLORATION AND PRODUCTION COMPANY LIMITED (SNEPCo.)nLOCATION: EKO ATLANTIC CITY, LAGOSnTYPE: SECURITY INFRASTRUCTURE UPGRADEnSCOPE: CONSTRUCTION OF DEDICATED ACCESS CONTROL BUILDING & GATE HOUSE AND DEPLOYMENT OF SNEPCo. COMPLIANT ACCESS CONTROL AND SURVEILLANCE SYSTEMSnnPROJECT OVERVIEW:nIn 2025, Horatio Limited executed the Access Control Building and Gate House project at Alpha 1 Podium was executed by Horatio Limited in 2025 to enhance the physical security, access management and operational control of SNEPCO.’s occupied areas with the Alpha 1 commercial building.nnTHE CHALLENGE:nSNEPCo. required the construction and enhancement of dedicated buildings that will establish controlled and auditable access points for all personnel, visitors and vehicular traffic while maintaining uninterrupted operations within the wider facility. nnTHE HORATIO SOLUTIONnHoratio deployed a multidisciplinary engineering and HSSE team structured to meet SNEPCo. Governance, assurance and HSE requirements.nnKey Deliverables:nnSite Preparation and Enabling WorksnGate House ConstructionnAccess Controls SystemsnSurveillance and Monitoring SystemsnElectrical and Low-Current WorksnExternal WorksnnThe works were delivered within an operational commercial environment with strict adherence to Goal Zero in alignment with SNEPCo.’s corporate security standards and Eko Atlantic City regulations.nnTHE IMPACTnIn the long-term, this project boost SNEPCo.’s robust security infrastructure and reduces its security risk exposure through controlled entry and surveillance n In alingment with Alpha 1’s premium commercial profile.